From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 12:01 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Barry Hill 

Last updated:  01/03/16

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Eagle River, AK  99577
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Barry Hill - Site Scheduler

Resume Value: ugjd3k75w8a3xjb3   

  

 

Barry Hill, Sr.
 
 
 
 
 
PO Box 771002 ● Eagle River, AK 99577 ● Phone: 907-460-4143 ● E-Mail: AggieHills@gmail.com
Career Summary
BPXA Activity Planning Site Scheduler, North Area Scheduler, Performance Planning Team Leader, LineWide
Maintenance Supervisor, Maintenance Coordinator, Maintenance Planner/Scheduler, OCC Controller, HS&E
Compliance Coordinator and field operations. Work Management System experience in PassPort Portal J and
Maximo databases. Scheduling tools: Microsoft Projects Enterprise and Primavera 6. Experienced AP Site
Scheduler P6 trainer.
Experience
BPXA, Anchorage AK
- Upstream
November 2007-present
• Site Scheduler (GC2 & GC3) – (2/2013-Present) 14X14 Rotation
o Activity Planning, AP, Site Scheduler duties include 2W/6W meeting preparation and facilitator.
o Coordinate delivery of the 2 week integrated site schedule. Includes multi-function complex activity coordination
with Operations and Maintenance.
o Ensure all activities meet required 2-week gate readiness criteria. Gates include Work Order status, materials,
MOC-(Mgmt. of Change), status, Work Packs, Resources and Regulatory Compliance.
o Assist Facility Planner to manage backlog of planned jobs into the site execution schedule.
o Daily quality control of Maxavera data exported from Maximo, (WMS). Function / Operations coordination of
onsite activities for Plant maintenance.
• North Area Scheduler- (5/2010 to 2/2013) 14X14 Rotation
o Deliver fully integrated 12 Week Primavera 6 schedule for all constrained activities, CAP, for Endicott, Milne
Point, North Star and Badami. Staff included six Site Schedulers.
o Developed 8Q Gate Criteria spreadsheet for tracking 8Q, 12W, 6W and 2W gate readiness.
o Trained, mentored two Site Schedulers, Gathering Center 2 and GC-3.
o Continuous Improvement contribution to Activity Planning scheduling standardization process. Standardization
included daily scheduling and 2W/6W scheduling procedures and P6 layouts.
o Ensure gate readiness for 12-week and 6-week schedule activities.
o Supported 8Q Scheduling and Facilitation of 8Q meetings. Developed process for verifying budget items into
the 8Q schedule by utilizing Cost Analysis data.
• Performance Planning Team Lead, (11/2007-4/2010) 7X7 Rotation
o Key contributor on Integrated Facility Scheduling Team to develop and implement slope-wide integrated
Scheduling system for Alaska Prudhoe Bay. Microsoft Projects tool chosen for implementation.
o Staff included six BP Planners, and 12 Integrated Facility Scheduler’s and Technical Support Team.
o Facilitated stakeholder meetings for Integrated Facility Scheduling tools and process with the 16 production
and non-production facilities.
Alyeska PL Svc Company, Fairbanks AK
- Midstream June 2000-November 2007
• LineWide Maintenance Supervisor- (5/2005-11/2007). 14X14 Rotation
o Supervised Line Wide Maintenance Team for the Trans-Alaska Pipeline.
o Direct management of company policies and procedures including review and approval.
o Managed 34 technicians on two-week shift rotations. Disciplines were Electrical, Mechanical, Instrumentation
and SCADA.
o Responsible for Preventative Maintenance activities for 72 Remote Gate Valves and 7 active 48” Main Line
Pump Stations.
• Line Wide Maintenance Coordinator- (1/2004-5/05) 14X14 Rotation
o Supervisor relief support, Measuring and Testing Equipment control, rolling stock management and
maintenance activity coordination with Operations.
• Maintenance Planner/Scheduler- (6/2000-1/04) 14X14 Rotation
 
 
 
 
 
o Duties include Planning & Scheduling Maintenance Technicians for Pump Station’s 05 through 07. PassPort,
Portal J tool utilized for work management system.
o Key contributor in developing “All Asset Backlog” and the “Scheduling Application” used for Central
Maintenance.
ARCO Pipe Line Company, Houston TX - Midstream
August 1990 July 2000
• Maintenance Planner - (1996 – 2000)
o Managed Regulatory & Safety Critical PMs, Maintenance PMs and Corrective Work Orders with Maximo
CMMS.
o Planned and Scheduled Work Orders for DOT regulated and non-regulated Critical Equipment for two 30”
Seaway Crude, 18” Products and 10” Black Lake NGL System.
o Key contributor to improving Cushing Station Rupture Disk failure issue.
• Supervisor / Controller - (1993 – 1996)
o Operations Control Center Supervisor for Marine Terminals-TX City-Freeport, Seaway Crude P/L, West Texas
Gathering, Louisiana Black Lake NGL P/L, Petrochemical and Sheep Mountain CO2 Pipe Lines.
o Coordinated water-born crude from Freeport, TX Marine Terminal to Cushing Oklahoma via Seaway 30” line.
o Monitored pipeline integrity on 1500 miles of pipe ranging from 8” to 42”.
• HS&E Compliance Coordinator - (1991-1993)
o Managed State and Federal Waste Reporting for seven states as Arco Pipeline’s first Compliance Coordinator
on Products Pipe Line. Maintained records on SARA Title III inventories throughout the Products Pipeline
System.
• Pipeliner / Deliveryman - (1990 – 1991)
• Duties included pipeline excavation inspections, tank farm gauging, product deliveries/receipts, and meter proving from
Houston Pump Station to Bryan Tank Farm.
Education
Bachelor of Science Degree (Range Science)
Texas A&M University
Training
-Villanova-Essentials of Project Mgmt. (VIL37) -Bovo-Tighe Leadership -Levinson Accountability -Latent Cause Analysis -
Reliability Centered Maintenance (RCM)
-NACE Basic Corrosion -Certified Welding Inspector-Plants and Pipelines - National Welding Inspection School -Sulzer
Bingham Pumps -API 653 Tank Inspections
2



Experience

BACK TO TOP

 

Job Title

Company

Experience

Site Scheduler

BPXA

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Site Scheduler

 

Target Company:

Company Size:

Occupation:

Installation/Maintenance/Repair

·         Oil Rig & Pipeline Install/Maintain/Repair

 

Target Locations:

Selected Locations:

US-AK-Anchorage